International Maritime Associates, Inc.     |   home
Shuttlle Tanker Requirements Study Outline   |   Shuttle Tanker Requirements Study Lists of Exhibits
Shuttle Tanker Requirements Study Lists of Exhibits
Ultra-Deepwater Plays in the Gulf of Mexico
Trend in Deepwater and Shallow Water Oil Production in the Gulf of Mexico
BOE Added by Water Depth in the Gulf of Mexico Over the Past 35 Years
Ultra-Deepwater Leases in the Gulf of Mexico
Ultra-Deepwater Sites Producing or Being Developed in the Gulf of Mexico
Wells Spudded in Water Depths of 5,000 ft. or Greater
Applications to Drill in 5,000 ft. or Greater Submitted Since 1999
Ultra-Deepwater Drilling Plans Submitted to MMS Since 1999
Drilling Currently Taking Place in Water Depths of 5,000 ft. or Greater
Number of Sites in Ultra-Deepwater at Various Stages of Development
Summary of Drilling Activity on Development Sites in Water Depths of 5,000 ft. or Greater
Portfolio of Priority Development Sites
Drill Rigs Required to Explore and Develop Ultra-Deepwater Priority Sites
Deepwater Oil and Gas Pipelines in the Gulf of Mexico
Planned Mardi Gras Transportation System
Capex of Various Diameter Pipelines Installed in 2000
Cost Structure of Land and Offshore Pipelines
Capex for Recent Large Diameter Offshore and Land Pipeline Completions
Estimated Average Capex for Offshore Pipelines
Trend in Average Pipeline Capex Per Mile
Estimated Capex Per Mile of Ultra-Deepwater Pipelines
1999 Operating Results of Two Deepwater Pipelines
Characteristics of Four Recently Delivered Shuttle Tankers
Shuttle Tankers Currently in Service Worldwide
Layout of the 108,000 dwt Shuttle Tanker Nordic Savonita
Tanker Berthing Capabilities at Gulf Coast Refineries
Capex for Recent Shuttle Tankers
Gulf of Mexico Shuttle Tanker Estimated Annual Operating Cost
Characteristics of the Four Fields Selected for Comparison
Direct Shuttle Tanker Routes to Lake Charles
Shuttle Tanker Routes via LOOP to Lake Charles
Pipeline Routes via Existing Infrastructure to Lake Charles
Distances and Connections for the Transport Possibilities
Transport Cost from Walker Ridge 633 via Pipeline and Shuttle Tanker
Transport Cost from Green Canyon 845 via Pipeline and Shuttle Tanker
Transport Cost from Garden Banks 949 via Pipeline and Shuttle Tanker
Transport Cost from Atwater Valley 113 via Pipeline and Shuttle Tanker
Breakeven Distance from Infrastructure in Rugged and Smooth Terrain Under Nine Scenarios
Pipeline Unfriendly Area in the Gulf of Mexico
Potential Infrastructure Connections for Ultra-Deepwater Fields
Distance from Infrastructure and Seabed Characteristics of Ultra-Deepwater Development Sites
Segmentation of Development Sites by Distance to Infrastructure and Seabed Conditions
Location and Key Operators of Shuttle Tanker Friendly Sites
Number of Sites Inaccessible to Infrastructure to Move to Production Over the Next 10 Years
Estimated Oil Production Capacity of GOM Floating Production Systems Operating or On Order
Forecast of Number of Shuttle Tankers and Delivery Timing
Shuttle Tanker Requirements Under Various Distance Breakeven Scenarios
Coscol Marine's Performance Requirements for Gulf of Mexico Shuttle Tankers
Navion/Skaugen Shuttle Tanker Design
U.S. Shipyards Capable of Building a 244 x 37 Meter Shuttle Tanker
What Can Be Included in Title XI Project Cost
Some Recently Approved and Pending Title XI Guarantees Involving Offshore Equipment
Comparison of Shuttle Tanker Financing Options