International Maritime Associates, Inc.     |   home

Floating Production Systems Report Series - 2008 | March 2008 Report Cover - Table of Contents - List of Exhibits | November 2007 Report Cover - Table of Contents - List of Exhibits | July 2007 Report Cover - Table of Contents - List of Exhibits | March 2007 Report Cover - Table of Contents - List of Exhibits | November 2006 Report Cover - Table of Contents - List of Exhibits | July 2006 Report Cover - Table of Contents - List of Exhibits | March 2006 Report Cover - Table of Contents - List of Exhibits | November 2005 Report Cover - Table of Contents - List of Exhibits | July 2005 Report Cover - Table of Contents - List of Exhibits | April 2005 Report Cover - Table of Contents - List of Exhibits | November 2004 Report Cover - Table of Contents - List of Exhibits | July 2004 Report Cover - Table of Contents - List of Exhibits | March 2004 Report Cover - Table of Contents - List of Exhibits | October 2003 Report Cover - Table of Contents - List of Exhibits | June 2003 Report Cover - Table of Contents - List of Exhibits | February 2003 Report Cover - Table of Contents - List of Exhibits | August 2002 Report Cover - Table of Contents - List of Exhibits | April 2002 Report Cover - Table of Contents - List of Exhibits | November 2001 Report Cover - Table of Contents - List of Exhibits | July 2001 Report Cover - Table of Contents | February 2001 Report Cover - Table of Contents | September 2000 Report Cover - Table of Contents | April 2000 Report Cover - Table of Contents | December 1999 Report Cover - Table of Contents | August 1999 Report Cover - Table of Contents | March 1999 Report Cover - Table of Contents | November 1998 Report Cover - Table of Contents | July 1998 Report Cover - Table of Contents | March 1998 Report Cover - Table of Contents | October 1997 Report Cover - Table of Contents | June 1997 Report Cover - Table of Contents | February 1997 Report Cover - Table of Contents | September 1996 Report Cover - Table of Contents


 

Floating Production Systems
April 2005 Report

I.     CURRENT AND PLANNED FLOATING PRODUCTION SYSTEMS

 

1. Overview of the Floater Business Sector        

Recent Orders and Deliveries    

What's Now Being Built         

Trend in Order Backlog          

Current Fabrication and Conversion Activity         

Floaters Planned or Under Study    


2. Details for Floaters in Operation, On Order or Planned       

Inventory of Floating Production Systems     

Inventory of Floating Storage Systems     

Production and Storage Systems Installed Since September 1996    

Floaters Now on Order     

Floating Production Projects Planned or Under Study     

  II.    RECENT DEVELOPMENTS

 

1. Projects in the Planning Stage       

Block 17 (Angola)    

Block 18 (Angola)     

Block 31 (Angola)    

Coco Marin (Cameroon)    

Egina (Nigeria)    

Kudu (Namibia)     

Azurite Marine (Congo)     

San Pedro (Cote d'Ivoire)    

Tari (Nigeria)     

Sunrise/Troubadour (Australia)     

Barque (New Zealand)     

Albacora (Brazil)     

Laurentian Basin (Canada)     

Hebron (Canada)     

Weizhou (China)     

Trident/Great White/etc. (Gulf of Mexico)     

Telemark (Gulf of Mexico)     

Blind Faith (Gulf of Mexico)     

Thunder Hawk (Gulf of Mexico)     

Broadwater Energy (U.S. East Coast)     

Rosebank/Lochnagar (U.K.)     

Krishna Godavari (India)     

Block 43/11 (China)     

Khmer Basin (Cambodia)     

Donggala (Indonesia)     

Kebabangan (Malaysia)     

Gumusut (Malaysia)     

Malikai (Malaysia)     

Malampaya (Philippines)     

Su Tu Den (Vietnam)       

 

2. Projects in the Final Design or Bidding Stage       

Akpo (Nigeria)     

Usan/Ukot (Nigeria)     

Moho/Bilondo (Congo)     

Stybarrow (Australia)     

Tui (New Zealand)     

Maari (New Zealand)     

PDET (Brazil)    

Frade (Brazil)     

ESS 132 (Brazil)     

BM-C-8 (Brazil)     

Corocoro (Venezuela)     

Neptune (Gulf of Mexico)     

Shenzi (Gulf of Mexico)     

Gulf Gateway (Gulf of Mexico)     

Ku Maloob Zaap(Mexico)     

Skarv (Norway)     

Gendalo (Indonesia)     

Bach Ho (Vietnam)          

 

3.  New Orders and Relocations      

Agbami FPSO vessel (Nigeria)     

BMG FPSO vessel (Australia)     

Marlim Leste FPSO vessel (Brazil)    

Jubarte FPSO vessel (Brazil)     

Seillean FPSO vessel (Brazil)     

Gomez production semi (Gulf of Mexico)

Peng Lai FPSO vessel (China)

Kikeh FPSO vessel (Malaysia)  

Kikeh DTU spar (Malaysia)

Jasmine FPSO vessel (Thailand)

Rong Doi FSO vessel (Vietnam)

Modec Speculative FPSO vessels   

Belenak LPG FSO vessel (Indonesia)

Oudna FPSO vessel (Tunisia)  

    

4.  Systems On Order      

Bonga FPSO vessel (Nigeria)     

Erha FPSO vessel (Angola)     

Chinguetti FPSO vessel (Mauritania) 

Piranema SSP FPSO vessel (Brazil)

Roncador P 52 production semi (Brazil)

Marlim Sul P 51 production semi (Brazil) 

White Rose FPSO vessel (Canada) 

Independence gas production semi (Gulf of Mexico)

Atlantis production semi (Gulf of Mexico)

Thunder Horse production semi (Gulf of Mexico)  

Alvheim FPSO vessel (Norway) 

Kristin production semi (Norway)       


5. Systems Recently Completed      

Sanha/Bomboco FPSO vessel (Angola)     

Kizomba B wellhead TLP (Angola)     

Baobab FPSO vessel (Cote d'Ivoire)     

Okwori FPSO vessel (Nigeria)     

Mutineer/Exeter FPSO vessel (Australia)     

Caratinga FPSO vessel (Brazil)     

Marlim Sul P 47 FPSO vessel (Brazil)  

Xijiang FPSO vessel (China)

Mad Dog production spar (Gulf of Mexico)         

 

6. Existing Systems   

Etame FPSO vessel (Gabon)     

Girassol FPSO vessel (Angola)     

Laminaria FPSO vessel (Australia)     

Woollybutt FPSO vessel (Australia)     

Coral production semi (Brazil)     

Terra Nova FPSO vessel (Canada)     

Langsa FPSO vessel (Indonesia)     

Madura FSO vessel (Indonesia)     

Marco Polo TLP (Gulf of Mexico)     

Allegheny TLP (Gulf of Mexico)     

Cantarell FSO vessel (Gulf of Mexico)     

Pierce FPSO vessel (U.K.)     

Snorre TLP (Norway)     

Varg FPSO vessel (Norway)     

Caofeidian FPSO vessel (China)     

7. Retirements      

Ex-Cooper production semi (Gulf of Mexico)     

Ex-South Tano production semi (Gulf of Mexico)     

    

    

III.     UNDERLYING MARKET DRIVERS

 

1.          Continued Growth In Oil Demand     

2.          Supply the Major Concern --- at Least Near Term     

3.          Crude Prices Have Hit New Highs    

4.          Projected Offshore E&P Spending is Strong   

5.          Offshore Rig Activity Continues to be Strong     

6.          Orders for Production Floaters Continue to Pick Up     


IV.     FORECAST OF FLOATER REQUIREMENTS

 

1.          Summary of the Available Five Year Market     

2.          FPSO Vessels     

3.          Production Semis    

4.          Tension Leg Platform Orders   

5.          Production Spars     

 

V.    COMPANIES AND TECHNOLOGY

 

1.          Compact Liquefaction Barge     

2.          Floating Regasification of LNG    

3.          The Issue of FPSO Cracking     

4.          Suezmax Size DP FPSO with Integrated Drilling Capability     

5.          New Shipyard for Floating Production Units     

6.          ABB Floater Designs Purchased by McDermott/Keppel Fels     

7.           Cylindrical FPSO Contract Sends Sevan Marine Skyward     

8.          Nigeria Issues Overhang Offshore Potential     

9.          Angolan Government Share of Oil Revenue Declining