|
International Maritime Associates, Inc. | home Floating Production Systems Report Series - 2008 | March 2008 Report Cover - Table of Contents - List of Exhibits | November 2007 Report Cover - Table of Contents - List of Exhibits | July 2007 Report Cover - Table of Contents - List of Exhibits | March 2007 Report Cover - Table of Contents - List of Exhibits | November 2006 Report Cover - Table of Contents - List of Exhibits | July 2006 Report Cover - Table of Contents - List of Exhibits | March 2006 Report Cover - Table of Contents - List of Exhibits | November 2005 Report Cover - Table of Contents - List of Exhibits | July 2005 Report Cover - Table of Contents - List of Exhibits | April 2005 Report Cover - Table of Contents - List of Exhibits | November 2004 Report Cover - Table of Contents - List of Exhibits | July 2004 Report Cover - Table of Contents - List of Exhibits | March 2004 Report Cover - Table of Contents - List of Exhibits | October 2003 Report Cover - Table of Contents - List of Exhibits | June 2003 Report Cover - Table of Contents - List of Exhibits | February 2003 Report Cover - Table of Contents - List of Exhibits | August 2002 Report Cover - Table of Contents - List of Exhibits | April 2002 Report Cover - Table of Contents - List of Exhibits | November 2001 Report Cover - Table of Contents - List of Exhibits | July 2001 Report Cover - Table of Contents | February 2001 Report Cover - Table of Contents | September 2000 Report Cover - Table of Contents | April 2000 Report Cover - Table of Contents | December 1999 Report Cover - Table of Contents | August 1999 Report Cover - Table of Contents | March 1999 Report Cover - Table of Contents | November 1998 Report Cover - Table of Contents | July 1998 Report Cover - Table of Contents | March 1998 Report Cover - Table of Contents | October 1997 Report Cover - Table of Contents | June 1997 Report Cover - Table of Contents | February 1997 Report Cover - Table of Contents | September 1996 Report Cover - Table of Contents
Floating
Production Systems
August
2002 Report
I.
CURRENT AND PLANNED FLOATING PRODUCTION SYSTEMS 1. Overview of the Floater Business
Sector 1 Recent Orders and Deliveries
1 What's Now Being Built
Where Units are Being Built
Floaters Planned or Under Study
4 2. Details for Floaters in Operation, On Order or Planned
6 Floating Production Systems
Now Operating or Available 6 Inventory of Floating Storage
Systems 20 Production and Storage Systems
Installed Over the Past 6Years 21 Details for Floaters Now on
Order 24 List of Floating Production
Projects Planned or Under Study 36
1. Projects in the Planning Stage 47 Block 14 (Angola) 47 Block 34 (Angola) 47 Bonga Southwest (Nigeria) 47 Ukot/Usan (Nigeria) 48 Kudu (Namibia) 48 Ikanga (Equitorial Guinea)
48 Chinguetti (Mauritania) 48 Sunrise (Australia) 49 BM-ES-1 (Brazil) 49 BC-60 (Brazil) 49 Newburn (Nova Scotia) 49 Liaodong Bay (China) 49 Neptune (Gulf of Mexico) 50 Cascade (Gulf of Mexico) 50 Trident (Gulf of Mexico.) 50 Ormen Lange (Norway) 51 Skarv (Norway) 51 Ranggas (Indonesia) 51 Benchamas/Jarmjuree (Thailand)
51
2. Projects in the Final Design or Bidding Stage
51 Xicomba (Angola) 52 Kizomba B (Angola) 52 Block 17 (Angola) 52 Block 18 (Angola) 53 Agbami (Nigeria) 53 Erha (Nigeria) 54 Akpo (Nigeria) 54 Okwori (Nigeria) 54 Moho/Bilondo (Congo) 54 Baobab (Cote d'Ivoire) 55 Block G (Equatorial Guinea)
55 Enfield (Australia) 55 Montara (Australia) 56 Roncador II (Brazil) 56 Ex-Roncador FSO (Brazil) 56 CFD-11 (China) 56 Peng Lai(China) 57 Haldia (India) 57 Magnolia (Gulf of Mexico) 57 Llano (Gulf of Mexico) 58 Red Hawk (Gulf of Mexico) 58 West Patricia (Malaysia) 58 Belanak (Indonesia) 58 PM-3 Phase 2 (Malaysia) 58 Oyong (Indonesia) 59 Malampaya (Philippines) 59
3. New Orders and Relocations 59 Albacora Leste FPSO vessel
(Brazil) 59 Snohvit LNG barge (Norway)
60 Generic FPSO vessels
60 Sanha/Bomboco FPSO vessel (Angola)
60 Production unit relocations
61
4. Units Under Construction 61 Bijupira/Salema FPSO vessel
(Brazil) 61 White Rose FPSO vessel (Canada)
61 West Seno TLPs (Indonesia)
61 5. Systems Recently Completed 62 Boomvang production spar (Gulf of Mexico) 62 Cakerawala FSO vessel (Malaysia)
62 Camar FSO vessel (Indonesia)
62 6. Existing Systems 62 Legendre MOPS (Australia)
62 Huizhou FPSO vessel (China)
63 Langsa FPSO vessel (Indonesia)
63 Leadon FPSO vessel (U.K.) 63
1.
Oil Demand Growth Expected by IEA to Accelerate Next Year 65
2.
But the World Economy Has Turned Increasingly Shaky Over the
Past Several Months 66
3.
The Oil Producers Have Continued to Manage Output to Maintain
Crude Prices
66
4.
Futures Prices for Crude and Natural Gas Have Remained Relatively
Robust 68
5.
The Dowturn in Offshore Drilling Activity in the U.S. Appears
to have Bottomed 69
6.
Floater Order Intake Over the Past Several Months Has Dropped
Below the Five Year Monthly Average
70
7.
Our Forecast Last November Floater Orders Appears on Target 71
IV.
TECHNOLOGY AND COMPANIES
1.
Average Oil Processing Capacity of Floating Production Units
Has Increased 47 Percent Over the Past Ten Years
73
2.
Average Processing Plant Size Differs Substantially By Type
of Floater
74
3.
FPSOs In The Gulf of Mexico Still Waiting For the First Project
75
4.
Mooring Lines Failed on the Girassol Offloading Buoy 75
5.
Halliburton KBR Finishes the Ultra-Deepwater Spar Conceptual
Engineering Study
75
6.
The August 2002 GOM Lease Sale Provides Incentives for Deepwater
Exploration and Development
76
7.
Technip-Coflexip Creates a Company to Manufacture Subsea Umbilicals
in Angola 76
|